FCC box cooler replacement

Delivered on time and on budget.

Budget
$4.3M
Duration
18 months
Status
Completed
Client
Confidential client
Refinery box cooler and instrumentation building

The project

Demolition of an existing FCC box cooler and control house, and a new box cooler and instrumentation building.

What we did

Civil, mechanical, structural, electrical and instrumentation work, cooling coil installation, connections to existing systems and outage work.

How we handled it

The box cooler was replaced in place during a constrained winter production schedule. Earned value tracked productivity, forecast cost and confirmed the schedule; coordination with operating systems was critical.

Results

  • Delivered safely, on time and on budget
Need more detail on this kind of project? Many of our engagements are confidential, so we share specifics directly. sales@executrekusa.com · (844) 466-8735

Tell us about your program.

A new capital project, a portfolio that needs a delivery system, or a project that has stalled: call or write, and a senior member of the team will get back to you.

(844) 466-8735sales@executrekusa.com
317 George Street, Suite 320, New Brunswick, NJ 08901More ways to reach us