Chemicals · Confidential client

Low-GWP chemical manufacturing, second product

Delivered on time and on budget.

Budget
$40M
Duration
30 months
Status
Completed
Client
Confidential client
Chemical process structure for a new low-GWP manufacturing process

The project

A new manufacturing process for a high-performance, low global warming potential product used in applications from aerosols to propellants and blowing agents: new structure, reactor vessels, piping, raw material and product storage, truck loading and unloading, and effluent treatment.

What we did

Work inside an operating facility: civil, mechanical, structural and electrical, reactor setting, automation, multiple tie-ins and railroad coordination, with an elevated process structure in a constrained operating area.

How we handled it

Comprehensive cost engineering and forecasting based on earned value measured productivity and validated the schedule through design and construction.

Results

  • Delivered safely, on time and on budget
Need more detail on this kind of project? Many of our engagements are confidential, so we share specifics directly. sales@executrekusa.com · (844) 466-8735

Tell us about your program.

A new capital project, a portfolio that needs a delivery system, or a project that has stalled: call or write, and a senior member of the team will get back to you.

(844) 466-8735sales@executrekusa.com
317 George Street, Suite 320, New Brunswick, NJ 08901More ways to reach us