Atmospheric relief valve mitigation
Delivered 14% below budget.
- Budget
- $145M
- Duration
- 24 months
- Status
- Completed
- Client
- Confidential client

The project
New piping and a flare system to tie process relief valve discharges into a managed closed system.
What we did
Civil, mechanical, structural and electrical work with vessel modifications, vessel setting and two new flares, multiple tie-ins and critical lifts. 105 relief valves across 33 services were connected into a header and flare system, with the work done across several turnarounds.
How we handled it
Earned value tracked productivity, forecast cost and checked the schedule. Continuous review of the construction contracting strategy and rigorous change management held the schedule through unforeseen conditions and engineering complications.
Results
- Delivered safely, on time and 14% below budget