One month early and 12% under budget.

Budget
$115M
Duration
30 months
Status
Completed
Client
Confidential client
Crane lifting a process module into a refinery pipe rack

The project

A new benzene saturation unit, a new naphtha fractionation unit and more hydrogen plant capacity.

What we did

Civil, mechanical and electrical work, modular construction and setting, heavy haul and lift, and a geodesic tank dome.

How we handled it

Thorough planning and offsite modular construction kept risk low, and no project contingency was used. Rigorous earned value measured productivity, predicted cost and validated the schedule.

Results

  • Completed 1 month ahead of schedule
  • Delivered 12% under budget
  • No project contingency used
Need more detail on this kind of project? Many of our engagements are confidential, so we share specifics directly. sales@executrekusa.com · (844) 466-8735

Tell us about your program.

A new capital project, a portfolio that needs a delivery system, or a project that has stalled: call or write, and a senior member of the team will get back to you.

(844) 466-8735sales@executrekusa.com
317 George Street, Suite 320, New Brunswick, NJ 08901More ways to reach us